DIY & Tools
Plan before you stick.
Measure the room, check the surface and understand the installation sequence before you start.

PCS calculator
Estimate quantity.
Enter room size.
Estimate includes a 10% planning allowance. Final quantity depends on room shape, cuts and installation layout.
Surface check
Good results start underneath.
Before installation, inspect whether the existing floor is clean, dry, smooth, flat and stable.
✓
CHECK
Dust · grease · moisture · deep grout · cracks · loose areas.
!
AVOID
Wet, unstable, heavily textured or severely uneven surfaces.
Installation
Six steps, no borrowed brand rules.
These are general BEASIO planning steps. We do not copy unsupported acclimation, primer or waiting-time claims from other brands.
01
CHECK
Clean, dry, smooth, flat and stable.
02
MEASURE
Measure room and plan cuts.
03
DRY-FIT
Test direction and joints first.
04
PEEL
Remove backing gradually.
05
PRESS
Press the full piece and edges.
06
INSPECT
Check joints, corners and edges.
